◈How2GetIt.Find your game ↗
WHERE & HOW TO FARM

Water Pump Supply Line Commissioning

At an exposed water source and its pump, following the pipe route to the selected fluid-consuming machine.

Before you go

Farming steps

  1. Check the selected machine’s current inputs and confirm that it requires water.
  2. Expose the source enough to place and inspect the pump without blocking access to it.
  3. Place the pump at the water source using the valid placement indication in the game.
  4. Route a short section of pipe from the pump toward the intended consumer.
  5. Connect the pipe to the consumer’s fluid input using the available equipment.
  6. Inspect the pump, each connection, and the consumer interface to check that the route is ready to supply the process.
  7. Run the consumer and confirm it receives water before extending or covering the pipe route.
  8. Keep the pump and endpoint reachable, and extend the line only when the checked section is delivering.

Repeat, collect and use

This is an ongoing supply loop while the source, pump, pipe route, and consumer remain connected and usable. The water is delivered to the process rather than collected as a separate solid stock; repeat commissioning for another consumer or a rebuilt route.

Common mistakes

  • Choosing a consumer without checking its current inputs: confirm it uses water before routing pipes.
  • Covering the route before testing it: verify delivery at the consumer first.
  • Assuming connected-looking pipes guarantee supply: inspect the pump and endpoint if the process stops receiving water.

When to stop or switch

Finish commissioning when the consumer receives water and the process can use it. If delivery fails, pause expansion and check the source, pump, pipe connections, and consumer inlet.

Sources & fact checks

What you can get here

Open a guide to find other locations and see what the item is used for.