◈How2GetIt.Find your game ↗
WHERE & HOW TO FARM

Water Extraction and Fluid Delivery

Choose a water body with room for extractor placement and a practical pipe route to the intended production area. Check the terrain and factory layout before building the destination around the inlet.

FIND THE ACTUAL LOCATION

Satisfactory resource & collectible map

Open full map ↗

Filter a resource, then select a marker or location below for its purity, elevation and coordinates. The map is hosted here.

Standard resource types and purity · Game-data snapshot 1.2.3.1. Randomized worlds differ. Nearby markers may be separated by cliffs or caves.

62 Coal locations

Coal locations on the Satisfactory terrain map, with purity and well markers
Coal locations · Select a marker to inspect its coordinates.

● Impure: amber● Normal: cyan● Pure: lime◆ Well outlet■ Well core

More resource maps for this guide
Water locations on the Satisfactory world map · Standard resource layout · Data 1.2.3.1
Water locations on the Satisfactory world map · Standard resource layout · Data 1.2.3.1

Before you go

Farming steps

  1. Choose the production site that needs water, then trace a pipe route back to a nearby water body.
  2. Place Water Extractors in the water and connect each outlet to the pipe network.
  3. Connect the extractor equipment to a powered grid so it can operate.
  4. Route the pipes toward the destination, keeping junctions and connections accessible for inspection.
  5. Connect the delivered water to the intended production building’s fluid input.
  6. Start the line and inspect the extractor and production building status to confirm water is being delivered and consumed.
  7. If the destination stops operating, check the route and equipment power before adding more extractors.

Repeat, collect and use

Water extraction and delivery continue while the extractors have power and their pipe route remains connected to an operating destination. This is a repeatable supply loop, not a one-time collection: maintain the line and add extraction capacity only when the intended production requires it.

Common mistakes

  • Placing an extractor without connecting its outlet leaves water undelivered; extend a pipe to the production input.
  • Forgetting the extractor’s power connection stops the supply equipment; include it in the grid plan.
  • Expanding extraction before checking a stalled destination may leave the actual pipe or power problem unresolved; inspect the existing line first.

When to stop or switch

Stop expanding when the intended production line receives water and runs as planned. If it stalls, identify whether power, piping, or destination demand is limiting the line before adding equipment.

Sources & fact checks

What you can get here

Open a guide to find other locations and see what the item is used for.