◈How2GetIt.Find your game ↗
WHERE & HOW TO FARM

Hauling and District Routes

At a District Crossing connecting two districts, with local Hauling Posts near production and storage where needed.

Before you go

Farming steps

  1. Place the District Crossing where the two district paths meet and verify each side belongs to the intended district.
  2. Open Manage Distribution and choose the goods to transfer.
  3. Set the sending district’s export setting for those goods and configure the receiving district to import as appropriate.
  4. Employ crossing workers on each side so transfers can take place.
  5. Provide accessible storage on both sides and check whether the intended good is moving.
  6. Use local Hauling Posts to move goods between production buildings and storage within each district.
  7. Review inventories and settings when a transfer stalls; adjust the route or distribution rule before adding workers.

Repeat, collect and use

Transfers continue while goods, workers, storage capacity, and the configured import/export rules allow them. Update distribution when district needs change.

Common mistakes

  • Expecting a Hauling Post to move goods through a crossing: assign crossing workers and configure distribution.
  • Setting export without a receiving route or storage: inspect both districts’ path and inventory access.
  • Trying to transfer goods before connecting two district networks: verify each crossing side belongs to the intended district.

When to stop or switch

Stop adding crossing or hauling staff when goods reach their destination reliably; revise distribution or storage if one side is accumulating goods it does not need.

Sources & fact checks

What you can get here

Open a guide to find other locations and see what the item is used for.